How we make it
From raw material to your site — in eight steps.
Every step is documented. Every batch is traceable. Every dispatch carries the NABL-grade test report — and clears a named quality gate before it leaves the plant.
Certified · Compliant · Cleared for dispatch
- ISO 9001:2015Quality Management System
- BIS-licensedIS 1678 · IS 2905 · IS 7321
- NABL-grade labLoad · dimensional · cube tests
- Govt. approved vendorMPPKVVCL & EPC primes
- Make in IndiaManufactured in Barwaha, MP
- 01
Raw material intake
Cement, aggregates, high-tensile steel wire and admixtures sourced from pre-qualified vendors with lot-level QA reports.
- Cadence
- Daily intake
- Standard
- IS 269 · IS 383 · IS 1786
- Quality gate
- Mill-test certificate & visual check on every lot
- 02
Steel preparation
Wires straightened, cut to length and threaded through moulds — every length traceable to its tensioning record.
- Cadence
- Per-batch
- Standard
- IS 1785
- Quality gate
- Dimensional verification before threading
- 03
Pre-stressing
Tensioning towers apply spec load to the wire array, ramped under controlled hydraulics.
- Cadence
- Per-batch
- Standard
- IS 1343 · IS 1678
- Quality gate
- Tensioning record signed before pour
- 04
Concrete batching
Mix design per IS specification, monitored for water-cement ratio, slump and air content.
- Cadence
- Continuous
- Standard
- IS 10262 · IS 456
- Quality gate
- Slump test on every batch
- 05
Pouring & moulding
Concrete poured into moulds and compacted through high-frequency vibrators — no voids, consistent density.
- Cadence
- Continuous
- Standard
- IS 2905
- Quality gate
- Visual void inspection
- 06
Curing
Accelerated steam or controlled water-curing cycle to reach 28-day strength on a compressed schedule.
- Cadence
- Hours (steam) / days (water)
- Standard
- IS 456
- Quality gate
- Cure-log recorded per pour
- 07
Testing
Load tests, dimensional checks and cube compression — NABL-grade reports against every batch.
- Cadence
- Per-batch
- Standard
- IS 2905 · IS 516
- Quality gate
- NABL-grade test report signed before despatch release
- 08
Dispatch
Own fleet, crane-fitted for pole handling. Routes planned for remote sites without third-party bottlenecks.
- Cadence
- On-schedule
- Standard
- Loading manual
- Quality gate
- Consignment + test report handed to consignee